  • Volume 1 - Application Summary [available upon request]
  • Volume 2 - City of Waukesha Water Supply Service Area Plan [available upon request]
  • Volume 3 - City of Waukesha Water Conservation Plan [available upon request]
  • Volume 4 - City of Waukesha Return Flow Plan [available upon request]
  • Volume 5 - City of Waukesha Environmental Report for Water Supply Alternatives [available upon request]

Supplemental application materials

DateTitle
March 2012City of Waukesha Lake Michigan Water Supply Application Technical Review of the Cost Estimate
Feb. 4, 2013Waukesha Water Utility Groundwater modeling – RJN Environmental Services
July 26, 2013RJN Groundwater Modeling Report [available upon request]
July 26, 2013RJN Groundwater Modeling Report Tables [available upon request]
Aug. 30, 2013Waukesha Water Utility Groundwater modeling – RJN Environmental Services [available on request]
Jan. 15, 2014Appendix E, Volume 2, Cost estimates – revised
Feb. 18, 2014Technical Memorandum – Environmental Impacts of a Lower Water Demand
Feb. 19, 2014Technical Memorandum – Water Demand Projections
March 25, 2014DNR Questions on Lower Water Demands Memo
April 10, 2014Attachment D Revised – DNR Questions on Lower Water Demand Memo
April 28, 2014Technical Memorandum – Supplemental Public Health and Environmental Information on Waukesha Water Supply Alternatives – Part 1
April 28, 2014Technical Memorandum – Supplemental Public Health and Environmental Information on Waukesha Water Supply Alternatives – Part 2
Jan. 6, 2015Return Flow Exhibit (this includes Alternative 6, returning up to 10.1 MGD)
Feb. 10, 2015Summary of Lake Michigan Nearshore Water Quality for EIS
Feb. 12, 2015“No Action Alternative” memo related to EIS
Feb. 19, 2015Costs associated with Direct to Lake Michigan Return Flow Option
Feb. 19, 2015Air Quality Clarification memo for EIS
Feb. 20, 2015Summary of Wetland Impacts (related to pipeline for EIS)
Feb. 20, 2015Additional information for EIS for river and stream impacts (51 pages)
March 6, 2015South Shore Outfall return costs (return)
March 6, 2015South Shore Outfall return costs (total costs)
March 10, 2015Waukesha Return to MMSD (South Shore Outfall details and EIR addendum)
March 23, 2015New Hydraulic modeling tables related to 10.1 MGD return to the Root River
April 2, 2015Waukesha Memo on Thermal
May 26, 2015Draft Memorandum – Antidegradation Evaluation for City of Waukesha
Oct. 28, 2015Reverse Osmosis Concentrate Disposal Issues
Nov. 3, 2015Conservation Plan Update
Nov. 25, 2015Predicting Future Water Levels in the Sandstone Aquifer of Southeastern Wisconsin

Correspondence

DateTitle
Dec. 3, 2013Letter to Waukesha Water Utility
Dec. 13, 2013Letter to Waukesha Water Utility
Feb. 11, 2014Letter from Waukesha Water Utility – Re: Conservation
Feb. 20, 2014Letter from Waukesha Water Utility – Re: water demand projections
May 23, 2014Letter to the mayor of the City of Waukesha
July 17, 2014Letter to EPA Water Division Director Hyde re: Return Flow
July 17, 2014Letter to Waukesha Water Utility re: Return Flow
July 25, 2014Letter from City of Waukesha re: Return Flow
Sept. 4, 2014Letter from EPA Water Division Director Hyde re: Return Flow
April 2, 2015Letter from Waukesha Water Utility re: Return Flow
Nov. 17, 2015Letter from Charles Ledin to Waukesha Water Utility