Environmental Protection, Permit | Air Permits

Public Notice of an Air Pollution Control Permit Application Review for Nemadji Trail Energy Center, Douglas County, WI

Date: 05/23/2022

Time: 9:30 a.m. - End of Agenda

Location: Virtual

Contact 

Jordan Munson, Jordan.munson@wisconsin.gov

Details 

This is a public hearing for an Air Pollution Control Permit Application Review for Nemadji Trail Energy Center in Douglas County.

Nemadji Trail Energy Center submitted a permit application, including plans and specifications to construct one natural gas-fired Siemens SGT6-8000H combined-cycle turbine with natural gas-fired duct burner and diesel fuel oil back-up [Maximum continuous rating: 4,671 MMBtu/hr higher heating value (HHV) when combusting natural gas, 4,027 MMBtu/hr, HHV when combusting diesel fuel oil] (P01), one 100 MMBtu/hr natural-gas fired auxiliary boiler (B02), three 345-kilovolt (kV) and two 19-kV low-side generator enclosed pressure circuit breakers with a guaranteed loss rate of sulfur hexafluoride of 0.5 percent by weight or less by year (F03), two 10 MMBtu/hr natural gas-fired heaters (P04 and P05), a 282 hp emergency diesel fire pump (P06), a 1,490 hp emergency diesel generator (P07), three diesel fuel tanks (T01 – T03), haul roads (F01) and natural gas and fuel oil piping components (F02) and operate a power generation facility.

Air pollution control construction permit no. 21-JAM-212.

Air pollution control operation permit no. 816127840-P01.