Public Notice of an Air Pollution Control Permit Application Review for Nemadji Trail Energy Center, Douglas County, WI
Date: 05/23/2022
Time: 9:30 a.m. - End of Agenda
Location: Virtual
Jordan Munson, Jordan.munson@wisconsin.gov
This is a public hearing for an Air Pollution Control Permit Application Review for Nemadji Trail Energy Center in Douglas County.
Nemadji Trail Energy Center submitted a permit application, including plans and specifications to construct one natural gas-fired Siemens SGT6-8000H combined-cycle turbine with natural gas-fired duct burner and diesel fuel oil back-up [Maximum continuous rating: 4,671 MMBtu/hr higher heating value (HHV) when combusting natural gas, 4,027 MMBtu/hr, HHV when combusting diesel fuel oil] (P01), one 100 MMBtu/hr natural-gas fired auxiliary boiler (B02), three 345-kilovolt (kV) and two 19-kV low-side generator enclosed pressure circuit breakers with a guaranteed loss rate of sulfur hexafluoride of 0.5 percent by weight or less by year (F03), two 10 MMBtu/hr natural gas-fired heaters (P04 and P05), a 282 hp emergency diesel fire pump (P06), a 1,490 hp emergency diesel generator (P07), three diesel fuel tanks (T01 – T03), haul roads (F01) and natural gas and fuel oil piping components (F02) and operate a power generation facility.
Air pollution control construction permit no. 21-JAM-212.
Air pollution control operation permit no. 816127840-P01.
Join this meeting by Zoom.
Join by phone: 312-626-6799; Meeting ID: 846 4408 0594