This is a meeting of the stakeholder team that is creating a new DNR technical standard for High Performance Dry Storm Water Basins.
Joe Stivarius, 530 E Ellendale Rd. #740, Edgerton, WI 53534, has applied to the Wisconsin Department of Natural Resources (DNR) for a permit to place a pier along the Rock River. This hearing is to gather public input about this proposed project.
This is a public hearing on a permanent rule, Board Order DG-25-19, to revise ch. NR 812 relating to well construction and pump installation.
Amy Hartman is proposing to construct a pier on the St. Croix River in Pierce County.
Pier Stan V. Smith Trust has applied to the Department of Natural Resources for a permit to construct a pier on the bed of Middle Lake.
Public hearing for draft air pollution control permit for ChemDesign Products Inc at 2 Stanton Street in Marinette.
This is a public informational hearing for a proposed dock on the St. Croix River in Pierce County.
The State Trails Council (STC) provides advice and consultation to the Department of Natural Resources on the planning, acquisition, development and management of trails in Wisconsin.
Public Hearing for a proposed pier project on the bed of Geneva Lake.
Meeting of the work team developing DNR Technical Standard 1072 Horizontal Directional Drilling.